A Victorian Renovation Project
Well, room by room, walls are being removed. Plaster, lathe, all cut out. The rumbling of saws rattles the house. The kitchen was one of the few rooms that was usable. Actually, one of TWO rooms that we were living in. And they took…
It’s all moving along. Slowly… but moving. We are removing more walls for electric and to replumb the radiators. Here are a few more pics of the destruction and rebuilding. First the walls and ceilings are removed. New wiring, plumbing for the heat system…
I searched on Facebook Marketplace for a vanity but just didn’t find one. Ken installed the new floor. Radiator was repainted and installed. And a new vanity ordered from Wayfair. Unfortunately, it didn’t arrive!! Said it was delivered, but wasn’t here. I shipped it…
We decide to do the floors too!! But it’s like a puzzle. We finish a couple of rooms and empty them. Floor crew comes in and does those floors. We let them dry and move stuff into them to empty other rooms so that…
The Evolution of a Bathroom…. Getting the original tub OUT took some work. They actually cut it in half. I think I missed that picture!! Prepped the floor — leveling it for new tub install. We decided to keep it in the same place….
Well, we had hoped for the bathtub and shower install this week, but it didn’t happen!! Perhaps next week!! We did see some progress, definitely slower than we want. Electrical is going in well and has gotten as far as they can get for…
In addition to the porch roof, the gutters, we have the ongoing projects: replumbing the heat system for the radiators, rewiring the entire house, and tearing walls out to allow for that, and repairing the structural damage from the lack of gutters. Rewiring We…